Skip to main content
Tru-Trac
All cases

Platinum · South Africa

Platinum mining — Spillage and belt-edge damage eliminated

Customer anonymised — outcome verified by Tru-Trac

Verified outcomes

  • Dominant outcome

    ~4 yrsbelt life
  • Secondary metric

    Eliminatededge damage
  • Secondary metric

    Eliminatedspillage

03 / Engineering narrative

The situation, the problem, and what changed.

  1. 01

    The situation

    A platinum operation experienced severe misalignment that caused both spillage and progressive belt-edge damage.

  2. 02

    The problem (root cause)

    The misalignment was creating compounding cost: belt edge wear shortened belt life, spillage created clean-up labour, and the underlying mistracking was never fully corrected.

  3. 03

    What Tru-Trac did

    Tru-Trac installed a Taper Trough Tracker after the loading zone and a Dual Return Tracker before the tail pulley.

  4. 04

    The outcome (measured result)

    Spillage and edge damage were both eliminated. The belt operated for almost four years before scheduled replacement — well above prior service life.

04 / Tru-Trac products on this case

The product family that did the work.

Browse the family pages for specifications, sizing, and the full range of variants matched to operating conditions.

A similar conveyor problem?

Tell us where the failure repeats.

If your conveyor matches this profile, the fastest path is a structured assessment. We'll route you to the right Tru-Trac engineer or regional partner.